A selection of completed projects in energy plant engineering and industrial construction. The projects include process units for waste-to-energy, boiler pressure parts, steel structures, facade systems and turnkey industrial buildings. For each project we state the scope of supply and the key technical parameters.

Energy

Manufacture and installation of a boiler economiser, Ostrava Hazardous Waste Incineration Plant
Manufacture and installation of a boiler economiser, Ostrava Hazardous Waste Incineration Plant, photo 2
Manufacture and installation of a boiler economiser, Ostrava Hazardous Waste Incineration Plant, photo 3
Photo 1 of 3

Manufacture and installation of a boiler economiser, Ostrava Hazardous Waste Incineration Plant

ClientRECOVERA Využití zdrojů a.s.
Project period2023

Our role

Manufacturing, supply, dismantling, installation

Scope

Manufacture of pressure equipment to the client's drawings. Manufacture of the economiser tube coils including the flue gas duct, 3 separate blocks joined only during installation, fitted with a hopper at the bottom. Dismantling of the existing economiser and installation of the new one, including insulation and cladding.

Key figures

3 separate economiser blocks joined during installation, flue gas duct with hopper, handed over within the outage period

Manufacture of a complete boiler assembly for Kovosta-fluid
Manufacture of a complete boiler assembly for Kovosta-fluid, photo 2
Manufacture of a complete boiler assembly for Kovosta-fluid, photo 3
Manufacture of a complete boiler assembly for Kovosta-fluid, photo 4
Manufacture of a complete boiler assembly for Kovosta-fluid, photo 5
Manufacture of a complete boiler assembly for Kovosta-fluid, photo 6
Photo 1 of 6

Manufacture of a complete boiler assembly for Kovosta-fluid

ClientKovosta-fluid, a.s.
Project period2023

Our role

Manufacture of pressure equipment, supply

Scope

Manufacture of pressure equipment to the client's drawings. Manufacture and supply of a complete boiler assembly to the customer's requirements, ready for installation.

Key figures

26.2 t boiler assembly weight, complete assembly ready for installation

Repair of Kaplan turbine stay vanes, Štěchovice Power Station
Repair of Kaplan turbine stay vanes, Štěchovice Power Station, photo 2
Photo 1 of 2

Only provider in the Czech Republic

Repair of Kaplan turbine stay vanes, Štěchovice Power Station

ClientČEZ, a. s.
Project period2021

Our role

Design of the repair procedure, execution of the repair

Scope

Design of a special repair procedure for the cavitation-damaged parts of the vanes, meeting the requirements on shape and surface roughness after the final repair. Repair of all stay vanes, including replacement of 1 vane. Weld build-up of cavitation damage, peening of welds, grinding and polishing to templates. The work was carried out using a special procedure under strict conditions and in confined spaces.

Key figures

All stay vanes repaired, 1 vane replaced, shape and surface roughness ground and polished to templates

Supply and installation of stainless steel bearing cooling piping, Dlouhé Stráně Power Station
Supply and installation of stainless steel bearing cooling piping, Dlouhé Stráně Power Station, photo 2
Supply and installation of stainless steel bearing cooling piping, Dlouhé Stráně Power Station, photo 3
Supply and installation of stainless steel bearing cooling piping, Dlouhé Stráně Power Station, photo 4
Photo 1 of 4

Supply and installation of stainless steel bearing cooling piping, Dlouhé Stráně Power Station

ClientČEZ, a. s.
Project period2020

Our role

Pipe sizing, manufacturing, installation

Scope

Pipe sizing to maintain the required cooling water flow. Replacement of end-of-life steel piping with stainless steel. Manufacture and installation from semi-finished elbows, fittings and pipes. Increased requirements on weld quality.

Key figures

2 turbine-generator sets TG1 and TG2, stainless steel piping, cooling water flow verified by measurement

Installation and start-up of the boiler K12 technology, Komterm Kopřivnice
Installation and start-up of the boiler K12 technology, Komterm Kopřivnice, photo 2
Installation and start-up of the boiler K12 technology, Komterm Kopřivnice, photo 3
Photo 1 of 3

Installation and start-up of the boiler K12 technology, Komterm Kopřivnice

ClientKOMTERM Technology, s.r.o.
Project period2020

Our role

Design review and modifications, design, manufacturing, installation, complete delivery

Scope

Review of the design and partial modifications to it, optimisation of the connection to the existing plant. Installation of the wood chip boiler and its connections, that is, economiser, valves, pumps, connection to the hot water system and integration into the plant. An additional part was our own design and calculation of the economiser, the design documentation, its manufacture, installation and connection to the hot water system.

Key figures

1 wood chip boiler K12, 1 economiser of our own design, calculation and manufacture, complete delivery from design to start-up

Manufacture and installation of the pressure assembly of boilers K5 and K6, Trmice Heating Plant

Manufacture and installation of the pressure assembly of boilers K5 and K6, Trmice Heating Plant

ClientČEZ, a. s.
Project period2019

Our role

Consultation on the repair solution, manufacturing, supply, dismantling, installation

Scope

Consultation with the customer on the repair solution for boilers K5 and K6. The repair was carried out with our own resources, including in-house manufacture of the steam superheaters, that is, the tube coils. Supply, dismantling of the existing superheaters and installation of the new ones, including insulation, cladding and temporary works.

Key figures

approximately 73 t of tube coils (steam superheaters), 2 boilers K5 and K6

Replacement of superheaters II and IV including headers on boilers K1 to K6, Mělník Power Station
Replacement of superheaters II and IV including headers on boilers K1 to K6, Mělník Power Station, photo 2
Photo 1 of 2

Replacement of superheaters II and IV including headers on boilers K1 to K6, Mělník Power Station

ClientDTZ Liberec s.r.o.
Project period2018–2019

Our role

Manufacture of pressure equipment, dismantling, installation

Scope

Manufacture of pressure equipment to the client's drawings. Tube coils of steam superheaters II and IV including headers. Dismantling of the existing superheaters and installation of new ones on six boilers K1 to K6 in accordance with the client's documentation and requirements.

Key figures

63 t of pressure parts, 6 boilers K1 to K6, 2 steam superheaters per boiler

Conversion of the start-up boiler house to gas firing, Chvaletice Power Station
Conversion of the start-up boiler house to gas firing, Chvaletice Power Station, photo 2
Conversion of the start-up boiler house to gas firing, Chvaletice Power Station, photo 3
Photo 1 of 3

Conversion of the start-up boiler house to gas firing, Chvaletice Power Station

ClientSev.en EC, a.s.
Project period2017–2018

Our role

Manufacturing, dismantling, installation, start-up

Scope

Manufacture of a new OKP 25 boiler as a designated pressure assembly. Dismantling of the old boiler and installation of the new one, including installation of an economiser and a new gas burner. Supply of pressure and non-pressure parts, including refractory linings, insulation and cladding. Start-up of the equipment.

Key figures

22 t of pressure and non-pressure parts, 1 new OKP 25 boiler, 1 new gas burner

Modernisation of boiler passes I and II, Ostrava Hazardous Waste Incineration Plant

Modernisation of boiler passes I and II, Ostrava Hazardous Waste Incineration Plant

ClientRECOVERA Využití zdrojů a.s. (SITA a.s. at the time of the project)
Project period2015

Our role

Repair design, manufacturing, supply, dismantling, installation

Scope

Replacement of approximately one third of the boiler, from the flue gas inlet to the hopper. The brief required a feasible dividing plane for the replacement and completion of all operations within a short time. Manufacture of membrane wall panels, tube bending around wall openings, assembly into walls and installation. The supply included pressure and non-pressure parts, including refractory linings, insulation and cladding.

Key figures

30 t of pressure and non-pressure parts, approximately one third of the boiler replaced, handed over within the outage period

Construction

Architectural facade of the Victoria Palace residential building, Prague
Architectural facade of the Victoria Palace residential building, Prague, photo 2
Architectural facade of the Victoria Palace residential building, Prague, photo 3
Architectural facade of the Victoria Palace residential building, Prague, photo 4
Photo 1 of 4

Architectural facade of the Victoria Palace residential building, Prague

ClientVítězné náměstí s.r.o., part of the Penta group
Project period03/2023 – 06/2024

Our role

Supply of facade fins and glass balustrades

Project type

Architectural facade

Scope

Supply of facade fins and glass balustrades, section 04 GLASS. The facade combines glass, aluminium and steel. The critical point is where the materials meet, that is, anchoring, expansion and joint tightness, because each material expands differently with heat and transfers loads differently. Manufacturing tolerances had to remain identical across the entire surface, otherwise any deviation would have been visible on the building.

Building and location

Residential building on Vítězné náměstí, Prague 6

Hyundai car showroom, Uherský Brod
Hyundai car showroom, Uherský Brod, photo 2
Hyundai car showroom, Uherský Brod, photo 3
Hyundai car showroom, Uherský Brod, photo 4
Hyundai car showroom, Uherský Brod, photo 5
Photo 1 of 5

Hyundai car showroom, Uherský Brod

ClientSlovácké strojírny, a.s.
Project period08/2019 – 12/2020

Our role

General contractor

Project type

General contracting

Scope

General contracting of the building. The investor dealt with a single partner for the entire building, and RUBING was responsible for coordinating the trades. The building combines a sales area and a service area with different requirements. The showroom is a visible space where glazed surfaces and precise detailing are decisive. The service area is an operational space where durability and maintenance are decisive. Both were built in one building to one schedule.

Building and location

Sales and service building for a car brand, Uherský Brod

PTÁČEK office and retail centre, Žilina
PTÁČEK office and retail centre, Žilina, photo 2
PTÁČEK office and retail centre, Žilina, photo 3
Photo 1 of 3

PTÁČEK office and retail centre, Žilina

ClientPTÁČEK, správa, a.s.
Project period04/2019 – 11/2020

Our role

General contractor

Project type

General contracting

Scope

General contracting of a building combining a retail hall and a two-storey office section. RUBING led the construction as the single contractor, and the investor dealt with one partner. The hall and office sections have different spans, floor build-ups and indoor environment requirements, so combining them in one building determines the layout, expansion joints and routing of services. The building is in Slovakia, so the design documentation and final building approval follow Slovak regulations.

Building and location

Building combining a retail hall and a two-storey office section, Žilina, Slovakia

P.V.N. shopping centre, Tábor
P.V.N. shopping centre, Tábor, photo 2
P.V.N. shopping centre, Tábor, photo 3
P.V.N. shopping centre, Tábor, photo 4
Photo 1 of 4

P.V.N. shopping centre, Tábor

ClientHinton a.s.
Project period02/2019 – 09/2019

Our role

Supplier of steel structures and cladding

Project type

Cladding

Scope

Supply of steel structures and cladding for a shopping centre combining several separate tenant units. The building has one envelope and several clients inside, each tenant with its own requirements for layout, utility connections and building services. The deadline is set by the lease agreements, because each tenant opens on an agreed day.

Building and location

Shopping centre with several tenant units, Tábor

Refurbishment of the cladding and lighting of operational buildings, Dětmarovice Power Station
Refurbishment of the cladding and lighting of operational buildings, Dětmarovice Power Station, photo 2
Refurbishment of the cladding and lighting of operational buildings, Dětmarovice Power Station, photo 3
Refurbishment of the cladding and lighting of operational buildings, Dětmarovice Power Station, photo 4
Photo 1 of 4

Refurbishment of the cladding and lighting of operational buildings, Dětmarovice Power Station

ClientElektrárna Dětmarovice, a.s.
Project period06/2017 – 10/2018

Our role

General contractor in a consortium of STAMONT, RUBING and EDĚ

Project type

Cladding

Scope

Refurbishment of the cladding and lighting of operational and production buildings. RUBING was a member of a consortium of contractors and was responsible for its part of the supply. The other parts were supplied by other consortium members, so this reference does not cover the refurbishment of the entire site. Production at the site continued, and the schedule followed outages and operational constraints.

Building and location

Operational and production buildings of Dětmarovice Power Station

Building envelope, plumbing and drainage and the boiler house HVAC process unit, Ledvice Power Station
Building envelope, plumbing and drainage and the boiler house HVAC process unit, Ledvice Power Station, photo 2
Building envelope, plumbing and drainage and the boiler house HVAC process unit, Ledvice Power Station, photo 3
Building envelope, plumbing and drainage and the boiler house HVAC process unit, Ledvice Power Station, photo 4
Photo 1 of 4

Building envelope, plumbing and drainage and the boiler house HVAC process unit, Ledvice Power Station

ClientALSTOM s.r.o.
Project period10/2010 – 09/2015, three separate contracts

Our role

Supplier of the building envelope, plumbing and drainage, the boiler house HVAC process unit and other packages, including construction documentation

Project type

Cladding and process units

Scope

Three separate contracts over the five years of the unit's construction. Lightweight building envelope based on built-up cladding with an exposed face of trapezoidal sheeting. Plumbing and drainage installations. The boiler house HVAC process unit, that is, heating, ventilation and air conditioning. RUBING produced the construction documentation for its own supplies, so design and execution remained with one supplier. The reference does not cover the construction of the unit as a whole.

Building and location

Supercritical unit of Ledvice Power Station, the tallest industrial structure in the Czech Republic

Extension to the DEKTRADE office building, Olomouc
Extension to the DEKTRADE office building, Olomouc, photo 2
Extension to the DEKTRADE office building, Olomouc, photo 3
Photo 1 of 3

Extension to the DEKTRADE office building, Olomouc

ClientDEKINVEST, uzavřený investiční fond a.s.
Project period10/2014 – 03/2015

Our role

General contractor

Project type

Turnkey extension

Scope

General contracting of the office building extension. RUBING led the construction as the single contractor, so the investor did not have to coordinate the trades. With an extension, the critical points are the connection of the load-bearing structure to the existing building, the expansion joint between the old and new parts and the continuity of the envelope with the existing facade. The original building remained in use, and construction could not interrupt access or utilities.

Building and location

Office building at the DEKTRADE building materials site, Olomouc

Warehouse 1, ROCKWOOL Bohumín
Warehouse 1, ROCKWOOL Bohumín, photo 2
Photo 1 of 2

Warehouse 1, ROCKWOOL Bohumín

ClientROCKWOOL, a.s.
Project period11/2013 – 09/2014

Our role

General contractor, manufacture and installation of the steel structure and cladding

Project type

Turnkey industrial building

Scope

General contracting of the warehouse. In-house manufacture and installation of the load-bearing steel structure. Supply and installation of the cladding. The building adjoins the existing production site, so installation took place next to running operations, with restricted transport routes and divided work areas.

Building and location

Warehouse at the ROCKWOOL Bohumín site, a centre for industrial and technical insulation

Roofing and cladding of the Škoda Auto automated high-bay warehouse, Mladá Boleslav

Roofing and cladding of the Škoda Auto automated high-bay warehouse, Mladá Boleslav

ClientEfacec Praha, s.r.o., end user Škoda Auto
Project period05/2012 – 12/2012

Our role

Supply and installation of the roofing, cladding, drainage system and central heating

Project type

Cladding and roofing

Scope

Supply and installation of the roofing, including panels. Supply of the cladding, drainage system and central heating. On a warehouse roof of this size, tightness and drainage capacity are decisive, the falls and outlets are designed for torrential rain and the envelope must carry the snow load. A leak above an automated operation affects the technology, not just the building. The supply did not include the load-bearing structure of the warehouse or the storage technology.

Building and location

Automated high-bay warehouse, Mladá Boleslav

Cladding of the main production block, Tušimice II Power Station
Cladding of the main production block, Tušimice II Power Station, photo 2
Photo 1 of 2

Cladding of the main production block, Tušimice II Power Station

ClientOB No. 11 consortium, that is, Viamont a.s. and SMP CZ
Project period04/2009 – 10/2009 stage I, 01/2010 – 11/2011 stage II

Our role

Supplier of the cladding, including the supporting steel structure and associated trades

Project type

Cladding

Scope

Replacement of the cladding of the main production block in two stages. Dismantling of the original envelope including the supporting steel structure. Supply and installation of a new supporting steel structure and new cladding. Supply of central heating, ventilation and electrical installations with measurement and control. The schedule was set by the comprehensive renewal project, and the deadlines of both stages were fixed. The power station technology was supplied by other companies, and the reference does not cover it.

Building and location

Main production block of Tušimice II Power Station as part of the comprehensive renewal of the power station

We value the trust of our partners

ABB
Alstom
ČEZ Energetické služby
Skanska
Strabag
Swietelsky
Recovera
Decathlon
Ivitas
ENEZA
Klement Holding
Huisman Konstrukce
Elektrárna Chvaletice
BFS Industry
Penta Real Estate
Teplárna Otrokovice
Kešner
Aireko plus
Vesuvius
DTZ
Martia
Rockwool
Lovochemie
PBS
Modřany Power
Lenzing
IMOS Brno
CSG
Hinton
Energoaqua
Ptáček
ZVI
F.P.S. ARCO
Krevní centrum
DEKINVEST
Envirmine Energo
Slovácké strojírny
bauMax
Viamont
EKOMT
AmpluServis

Working on a similar brief?

Describe your technical brief and the scope you need to cover. We will review it with the head of division and propose the next steps.

Contact us
30+
years in business
700+
completed projects
120+
satisfied customers